Price: $29,000

Green Streak Mining Claim

A Gold Rush Expeditions, Inc. Mining Claim Property

Federally Registered Mining Claim ID:AMC441154

20 Acre Lode Claim — Green Streak District — La Paz County, Arizona

Mining Claim Introduction

The Green Streak, or Green Quartz Lode Mine is a large deposit located in central Arizona. The mine is a massive effort and has dominated the region while in production. The mine, according to reports is just over 9000’ on multiple underground levels.

There is no defined mapping of the workings.

The Green Streak Mine is and was large enough to be labeled in its own sub-District, known as the Green Streak District.

The claim and workings consist of a primary shaft, estimated to be 80-100’ in depth. There are reported drift levels cut off of this shaft. There is also at least one adit that has been blocked and likely runs into the main shaft which is estimated to only be 80-90' in depth, this shaft then branches out into a series of drifts below the surface. Reported workings in 1983 were 4100' on multiple levels. Mapping of the mines shows that the workings prior to 1942 were well over 9000' on multiple levels.

The mines were reportedly worked for gold with a copper byproduct. Noted for many pockets of high-grade ores, the mines were quite successful prior to their forced closure in 1941 by the federal War Act. Prior to closure.

Mining Claim Quick Facts

Access

Excellent 4WD access to the workings.

Waste Dump Present/Size?

Waste Dump estimated at 40k tons

Tailings Present/Size?

5k tons tailings, 10 stamp mill, leaching ponds reported.

Mine Cut/Structure

A number of adits and a primary shaft accessing the workings.

Total Workings

Reported as 9000 linear feet not accounting for stopes or drifts.

Commodities
Nearest City with Amenities

23 Miles to Parker, Arizona.

Parking

Unlimited parking and staging on claim.

Resources

None defined.

Other Items of Note
Acres and Type of Claim
20 Acre Lode Claim
Purchase Price
$29,000

Mining Claim Description

In its heyday, the mine boasted a double battery crusher, a gravity mill and 2 leaching ponds producing substantial copper and gold.

A small batch of 189 short tons was processed in 1953. This ore returned 4800 lbs copper, 21 oz. silver and 37 oz in gold. In today’s values, worth over fifty-seven thousand dollars. $57,414.00

In or around 1981, the mine was re-worked while the price of gold was high. Less than 50 tons were processed which netted the miners 46 ounces of gold over a 1 month period.