Click to read more...
Property Overview
The Pride or Arizona Pride Property as it is historically known is a sprawling copper and gold deposit that is closely associated with the New Standard Mine to the southwest.
The Pride Property has some geological structural differences from the New Standard and has historically produced gold with copper at a higher rate than the New Standard. The Pride Mine averages 6% copper per ton and 0.5% Gold per ton. The deposits at the Pride are exposed on the surface and can be mined and worked either by hand and highgrading, or with excavators.
There is a substantial Mill remnant on the property complete with settling ponds and foundations for crushers.
The Pride Property was utilized as recently as March of 2023 by EVR who reported 13.1% Copper and 27.1 grams per ton in Gold (0.95 oz per ton).
The company showed extensive assay results from the Pride property however was unable to qualify for funding and dissolved the company. The property was aquired by Gold Rush in 2025 and surveyed in the same year.
Extensive copper deposits are visible on the surface of the property. There are many large open cuts and stopes on the hill above the millsite. These copper veins show low grade gold deposits from 1/2 to 1 ounce per ton.
There has been no assessment of subsurface or blocked reserves, however, surface dumps were measured and assayed, content varied with gold content high in some dumps with little copper. Other dumps showed significant amounts of copper and very little gold. Average values were 0.28 oz/T Gold and 17% Copper (340 lbs per ton).
Gold Rush Expeditions, Inc. does offer mining consultation services and assistance with permits for a small fee.
Training courses for underground work and exploration can be found here: https://stayoutstayalive.com/training/
The Pride or Arizona Pride Property as it is historically known is a sprawling copper and gold deposit that is closely associated with the New Standard Mine to the southwest.
The Pride Property has some geological structural differences from the New Standard and has historically produced gold with copper at a higher rate than the New Standard. The Pride Mine averages 6% copper per ton and 0.5% Gold per ton. The deposits at the Pride are exposed on the surface and can be mined and worked either by hand and highgrading, or with excavators.
There is a substantial Mill remnant on the property complete with settling ponds and foundations for crushers.
The Pride Property was utilized as recently as March of 2023 by EVR who reported 13.1% Copper and 27.1 grams per ton in Gold (0.95 oz per ton).
The company showed extensive assay results from the Pride property however was unable to qualify for funding and dissolved the company. The property was aquired by Gold Rush in 2025 and surveyed in the same year.
Extensive copper deposits are visible on the surface of the property. There are many large open cuts and stopes on the hill above the millsite. These copper veins show low grade gold deposits from 1/2 to 1 ounce per ton.
There has been no assessment of subsurface or blocked reserves, however, surface dumps were measured and assayed, content varied with gold content high in some dumps with little copper. Other dumps showed significant amounts of copper and very little gold. Average values were 0.28 oz/T Gold and 17% Copper (340 lbs per ton).
Gold Rush Expeditions, Inc. does offer mining consultation services and assistance with permits for a small fee.
Training courses for underground work and exploration can be found here: https://stayoutstayalive.com.training/
Acres
Commodities
Type
55
Gold, Copper, Turquoise
Lode, Mill
Underground Dev
Surface Dump
Tailings
N/A
270,000 tons
30,000 tons
Access
Features
High Clearance 4WD
Mill Site, Exposed Copper veins, Surface Gold Deposits
Gold Reserves
Silver Reserves
Copper Reserves
Platinum Reserves
Tungsten Reserves
Molybdenum Reserves
Undefined
N/A
Undefined
N/A
N/A
N/A
(385) 218-2138
or use our contact form below